ECP-2026-198 · Legal & Consumer · Gas Utility / SSPD · Medellín (2026-04)
Gas Utility Overbilling Refunded Following Certified Meter Calibration Failure Under Law 142
Reported Situation & Bottleneck
Vacant residence during a 2-month trip recorded commercial-scale gas usage totaling COP 890,000.
Legal Mechanism & Verified Outcome
Law 142 Arts. 146 & 154 dispute demanding ONAC meter calibration testing while freezing disputed balance.: Lab confirmed faulty meter, free meter swap installed, and bill cut down to basic minimum charge.
Hire Service: Complaints Before Authorities | Read applicable legal guide