ECP-2026-198 · Legal & Consumer · Gas Utility / SSPD · Medellín (2026-04)

Gas Utility Overbilling Refunded Following Certified Meter Calibration Failure Under Law 142

Reported Situation & Bottleneck

Vacant residence during a 2-month trip recorded commercial-scale gas usage totaling COP 890,000.

Legal Mechanism & Verified Outcome

Law 142 Arts. 146 & 154 dispute demanding ONAC meter calibration testing while freezing disputed balance.: Lab confirmed faulty meter, free meter swap installed, and bill cut down to basic minimum charge.

HUB Verified · Validated outcome Certified Document · Audited dossier
ECP-2026-198 · HUB Verified · Certified Document

Hire Service: Complaints Before Authorities | Read applicable legal guide