Public Utilities · Law 142 of 1994 (Arts. 150, 152–158) · SSPD Circulars · SIC Telecom Rules · November 2026

How to Dispute Utility Bills in Colombia (Law 142 of 1994 & Superservicios)

HUB Verified · Certified Legal Rigor Certified Document · HUB Legal Validation
HUB Verified · Certified Document · Medellín, Colombia

2026 Direct Answer & Regulatory Synthesis

Consumer protections against inflated electricity, water, gas, or telecom bills: right to withhold disputed charges (Art. 155), 5-month back-billing cap, Superservicios appeals, and Deemed Approval (SAP). (Law 142 of 1994 (Arts. 150, 152–158) · SSPD Circulars · SIC Telecom Rules)

Back-billing time limit
Max 5 months (Art. 150)
Payment during dispute
Undisputed portion only (Art. 155)
Utility response deadline
15 business days
Missed deadline consequence
Deemed Granted (SAP Art. 158)

Three Legal Protections Utility Companies Rarely Tell You About

When an unexpectedly high electricity, water, or gas bill arrives, the costliest mistake is paying the full disputed figure out of fear of disconnection or letting 5 months lapse from the bill date.

Article 155 of Law 142 of 1994 strictly prohibits utilities from demanding payment of the disputed portion as a condition to process your claim or keep service active. As long as you pay the undisputed portion (typically your historical average), disconnection over the contested amount is unlawful.

Furthermore, whenever usage jumps sharply above historical averages ("desviación significativa"), the utility must inspect meter readings before finalizing the charge (Art. 149). Under Article 150, companies cannot back-bill forgotten consumption older than 5 months due to their own billing errors.

Table 1 — Two-Step Utility Dispute & Escalation Timeline
StageFiling BodyKey DeadlineExact Request to Include
1. Initial claimUtility provider (EPM, Enel, Vanti, Acueducto, etc.)Within 5 months of bill; 15 business days to answerBill recalculation, meter calibration check, and Art. 155 hold on disputed sum
2. Reconsideration & AppealFiled with utility (escalated to Superservicios / SSPD)Within 5 business days of receiving denialSingle motion titled "Recurso de reposición y en subsidio apelación ante la SSPD"
3. Deemed Approval (SAP)Notary + Superservicios (SSPD)If 15 business days lapse with no valid rulingNotarial certification of Deemed Approval & SSPD enforcement sanction (Art. 158)

Internet, Cable & Mobile Phone Disputes (SIC Oversight Instead of Superservicios)

Mobile phone, home internet, and cable plans are regulated by the CRC and overseen by the Superintendence of Industry and Commerce (SIC), not Superservicios.

If a telecom provider keeps billing after cancellation (when requested at least 3 business days before the cycle cutoff) or adds unapproved charges, they also have 15 business days to decide your PQR, with Deemed Approval applying on missed deadlines and direct escalation to the SIC.

Verification Checklist

  • Photograph the current meter readout with timestamp and compare against your last 6 bills.
  • Pay the undisputed historical average portion using a partial bill coupon under Article 155.
  • If denied, file a Motion for Reconsideration and Subsidiary Appeal to Superservicios strictly within 5 business days.

Frequently Asked Questions

Can the utility charge me for inspecting a faulty meter?

If inspection reveals a faulty meter or utility reading error, they cannot shift inspection charges to you or back-bill beyond 5 months.